top of page

LIID credits library

GETTING STARTED

CREDIT CATEGORY

DOENLOAD SCORECADD

Select a rating system

LIID GES-B(Green-eco-sustainable buildings)

LIID GES-B(Green-eco-sustainable buildings)

select a vision

v1 - LIID v1.0

No limit to maximum credits

Professionalism & informatization

Working with the right tools to demonstrate the informatization and professionalism of the design process while guaranteeing the completeness of the parameters. the BIM, is considered the most recommended.

Points = Size of electronic file(Mb)/1000Mb

If in any BIM sfotware(Revit, Vectorwork, ArchiCAD) *2

Scientificity

Adapt scientific simulation during the design, which means using a computer-based, mathematical model analog aspects of building performance to enhance the scientificity,e.g. thermal simulation/acoustic simulation/lighting simulation, etc.

Points = The number of simulation types 

Depth

Measure the thoughtfulness and depth of the design, which is performed by diagram in the output

Points = Number of diagrams 

or Points = Types of symbols and gradients used

Precision

Measure the Precision of the design, which is performed by quality of diagram in the output

Points = ( Pixels of symbols and icons/ Pixels of total image ) *100 (for each Diagram)

Hyper-realism

A measure of the design's consideration of use, the promise of goodness for the building's use.

Points = number of pixels in the drawing / 1,000,000

Diversity

Diversity, inclusiveness, the variety of activities and people served by the project.

Points = variety of modeling digital materials(3D modeling/ cut-out people trees) used in renderings

Vigor

The vitality of the program, building an active place that contributes to public life.

Points = Number modeling digital materials(3D modeling/ cut-out people trees) used in renderings

Quality

The quality of the image is measured by the traffic of the image sharing sites that are more used by professionals.

Points = number of "like" on Pinterest for the image/100

Public Attraction

Measurement of how well the architecture fits into the popular symbolic system through the project's "#" traffic on social media.

Score = Likes/100 + Comments + Retweets/100

Industry Recognition

Responds to the industry recognition of an article by its performance in professional magazines or journals.

Points = Number of published articles*Magazine (website/journal) impact factor
*Impact Factor: Sorted by the number of users and views of the website

SD Recognition

Scored by someone/part who pays.

Points = Range from -20 to +20

Text & Keywords

Whether eye-catching and eye-catching text and keywords are used.

Points = repetition of the program description text with the corpus
*Corpus, contains a collection of commonly used texts.

Experts

The image of the architect is also an important part of the program.

Points=number of titles of architect's license + years of work + number of interviews or public reports received 

Comprehensiveness & Innovation

Encourage innovation and more explorion about images

Points give by Jiahe Liang

bottom of page